BACK TO HEALTHCARE

Project Description

The Scripps Memorial Hospital Central System Pipe Renovation project consisted of the removal and replacement of select portions of the domestic water piping located in the central mechanical equipment room.  The scope included documentation of the existing installed conditions as required to develop plans for “OSHPD” review illustrating the “like with like” replacement of the central domestic water pressure regulating station, supply pipes, and return pipes.