Office

/Office

Sunroad Centrum

BACK TO OFFICE Description Sunroad Centrum is located at Kearny Villa Road, which is the old General Dynamic site, just east of Highway 163 and consists of the following:  One 11-story high-rise office tower, approximately 300,000 sf; four levels of subterranean parking, totaling 105,000 sf; and surface parking, totaling 213,000 sf. [...]

By | 2017-12-09T21:11:24+00:00 November 21st, 2017|Office|Comments Off on Sunroad Centrum

Sony Corporate Headquarters

BACK TO OFFICE Description Sony Corporate Headquarters is an 11-story, 450,000 sf high-rise office and research and development facility.  This building has large floor plates ranging from 42,000 sf to 52,000 sf each.  The project also includes a 6-story open parking structure that accommodates the necessary parking stalls for this new [...]

By | 2018-01-10T21:53:11+00:00 November 21st, 2017|Office|Comments Off on Sony Corporate Headquarters

BioLegend

BACK TO OFFICE Description The BioLegend project consisted of the tenant improvement to two existing, 2-story facilities located at 9727 and 9717 Pacific Heights Boulevard.  The 9727 location consisted of a 32,500 sf building and included a lobby, conference room, flow lab, kitchen, restrooms, office, and laboratory space rooms. The laboratory [...]

By | 2018-01-10T21:56:51+00:00 November 21st, 2017|Office|Comments Off on BioLegend

Nuvasive Tenant Improvement

BACK TO OFFICE Description The NuVasive Tenant Improvement project consisted of a 114,000-sf tenant improvement within two buildings of the existing campus.  The improvements took place on the first, second, and third floors of the east and west buildings.  MPA’s scope of work was to reduct and rezone the new renovated [...]

By | 2018-01-10T21:58:28+00:00 November 21st, 2017|Office|Comments Off on Nuvasive Tenant Improvement

Northrop Grumman at Spectrum

BACK TO OFFICE Description The Northrop Grumman at Spectrum project consisted of providing mechanical and plumbing construction documents for the core, shell, and new tenant improvement, totaling 230,000 sf in five buildings at the Spectrum development. The improvements included office, 24/7 electronic laboratories, a full-service kitchen and cafeteria, a large data [...]

By | 2018-01-10T21:59:26+00:00 November 21st, 2017|Office|Comments Off on Northrop Grumman at Spectrum

Summit at Rancho Bernardo

BACK TO OFFICE Description The Summit at Rancho Bernardo project consisted of a 5-story, 184,000 sf tenant improvement.  The project included improvements to the following spaces:  general open office space, conference rooms, electronics laboratory, assembly area, commercial kitchen, and a fitness area with shower/locker rooms.  The RF building is 3,000 sf [...]

By | 2018-01-10T22:01:08+00:00 November 21st, 2017|Office|Comments Off on Summit at Rancho Bernardo

Nokia Tenant Improvement

BACK TO OFFICE Description The Nokia Tenant Improvement project consisted of a fast track shell and tenant improvement for this research and development campus. The project accommodated two build-to-suit buildings containing over 323,500 sf of tenant space.  The 3-story facility houses high technology research laboratory areas and state-of-the-art office areas.  Nokia’s [...]

By | 2018-01-10T22:01:54+00:00 November 21st, 2017|Office|Comments Off on Nokia Tenant Improvement