admin

/admin

About admin

This author has not yet filled in any details.
So far admin has created 50 blog entries.

Gaslamp Courtyard Marriott

BACK TO HOTEL/CASINO Description The Gaslamp Courtyard Marriott project consists of a 5,000 sf lot, with one subterranean level which included back of house operations, a fitness area, utility rooms, parking, and a 12-story high-rise hotel which included a lobby mezzanine with 90 guest rooms, entry bar and lounge, and roof [...]

By | 2018-01-10T22:20:31+00:00 November 20th, 2017|Hotel /Casino|Comments Off on Gaslamp Courtyard Marriott

Hyatt Regency Residence at La Jolla

BACK TO HOTEL/CASINO Description The Hyatt Regency Residence at La Jolla project consisted of a new 20-story apartment tower with three levels of subterranean parking.  The 323,000 sf tower included public and back-of-house areas.  The 174 apartments ranged in size from 1,125 sf to 1,971 sf.  Our design also included a [...]

By | 2018-01-10T22:22:05+00:00 November 20th, 2017|Hotel /Casino|Comments Off on Hyatt Regency Residence at La Jolla

Marriott Lane Field North

BACK TO HOTEL/CASINO Description The Marriott Lane Field North project consists of an 18-story, dual-branded hotel with ground and second floor retail shops and restaurants and above-grade parking in a podium structure.  The hotel is designed in a modern architectural style that reflects the overall character of the waterfront. [...]

By | 2018-01-10T22:23:28+00:00 November 20th, 2017|Hotel /Casino|Comments Off on Marriott Lane Field North

Veteran’s Administration Medical Office Building Oceanside

BACK TO HEALTHCARE Description The Veteran’s Administration Medical Office Building project consisted of a shell core and tenant improvement of 86,000 sf.  This facility accommodates dental services, orthopedics, podiatry, optometry, an eye clinic, audiology, rehabilitative medicine, primary care, laboratories, radiology, outpatient surgery offices, consultation rooms, classrooms, conference rooms, and waiting rooms. [...]

By | 2018-01-10T22:25:53+00:00 November 19th, 2017|Healthcare|Comments Off on Veteran’s Administration Medical Office Building Oceanside

Scripps Memorial Hospital

BACK TO HEALTHCARE Description The Scripps Memorial Hospital Central System Pipe Renovation project consisted of the removal and replacement of select portions of the domestic water piping located in the central mechanical equipment room.  The scope included documentation of the existing installed conditions as required to develop plans for “OSHPD” review [...]

By | 2018-01-10T22:26:32+00:00 November 19th, 2017|Healthcare|Comments Off on Scripps Memorial Hospital

La Jolla Village Professional Center Medical Office

BACK TO HEALTHCARE Description The La Jolla Village Professional Center Medical Office project consisted of the demolition of the existing 8,320 sf El Torito Restaurant to make room for the construction of a 2-level, 14,750 sf medical office building with increased parking and other site improvements. Size 14,750 SF [...]

By | 2018-01-10T22:27:29+00:00 November 19th, 2017|Healthcare|Comments Off on La Jolla Village Professional Center Medical Office

Kaiser Permanente Outpatient Medical Center

BACK TO HEALTHCARE Description The Kaiser Permanente Outpatient Medical Center project consisted of renovations to to the existing medical center located in San Marcos, California.  Renovated spaces included: new exam rooms and reception area (Building 1), new reception and treatment room (Building 1), new treatment room (Building 3), and the new [...]

By | 2018-01-10T22:28:27+00:00 November 19th, 2017|Healthcare|Comments Off on Kaiser Permanente Outpatient Medical Center

San Diego Airport Terminal 2 Delta Airlines Tenant Improvement

BACK TO AIRPORTS Description The San Diego Airport Terminal 2 Delta Airlines Tenant Improvement project consisted of a 15,000 sf tenant improvement located on Level 1 of the new Terminal 2 West Building at the San Diego International Airport. The expanded terminal offers travelers a faster, smoother and amenity rich trip [...]

By | 2018-01-10T22:47:36+00:00 November 19th, 2017|Airports|Comments Off on San Diego Airport Terminal 2 Delta Airlines Tenant Improvement

San Diego Airport Terminal 2 United Airlines Tenant Improvement

BACK TO AIRPORTS Description The San Diego Airport Terminal 2 United Airlines Tenant Improvement project consisted of a 16,000-sf tenant improvement located on Levels 1, 2, and 3 of the new Terminal 2 West Building at the San Diego International Airport. The expanded terminal offers travelers a faster, smoother, and amenity [...]

By | 2018-01-10T22:42:11+00:00 November 19th, 2017|Airports|Comments Off on San Diego Airport Terminal 2 United Airlines Tenant Improvement

Sapphire Tower

BACK TO APARTMENTS Description Sapphire Tower redefines urban sophistication in this 32-story, mixed-use, high rise tower by providing panoramic views of the ocean and the San Diego Bay front.  This project consists of 97 luxury homes, underground parking with 183 spaces, 13,000 sf of office space, and 2,000 sf of retail [...]

By | 2018-01-10T22:29:14+00:00 November 19th, 2017|Apartments|Comments Off on Sapphire Tower